I want to schedule a pipeline to run every night at 10:00 pm. But, I only want it to run if there are changes in the materials for the pipeline. Does anyone know if this is possible. From what I have found. it looks like it will run whether or not there are changes.
Comments
0 comments
Please sign in to leave a comment.