    Hi Jebastine


    The only difference I can see to the way I have it set up is that the first stage usually has approval type= manual, and then subsequent stages are set to success (of the previous stage), but I don't know if that would make a difference here. Does this pipeline configuration work OK if you manually trigger it?

  • Avatar
    Jebastine Vetharaj

     Yes, it is running fine when I manually trigger it. I will try with "Manual" for first stage and let you know.

  • Avatar
    Ian Bridson

     I just checked our config for this issue, and realised that setting the Stage to On success would give you a CI pipeline that built on every check-in, so it sounds like you should have it set to Manual so that it only builds on the Timer or manually.

  • Avatar
    Jebastine Vetharaj

    Ian,


    It worked. I have enabled "poll for changes" and made the first stage manual.